Clyde Wind Farm
Clyde Wind Farm
Project: Clyde Wind Farm
Client: SSE Renewables
Our Services:
- CDM Coordinator
- Client Safety Manager
- Principal Contractor Safety Manager
Contract Value: £500+ million
Clyde Wind Farm remains the largest single application wind farm in Europe. The site covers approximately 47.5 Sq. km of existing farmland and commercial forestry and straddles the M74. The project comprises 152 Siemens 2.3MW WTG, 2 sub stations, 2 control and 1 operation building and an off-site radar station. BOP works include formation of over 100km of access track, cabling, WTG bases comprising approximately 55 tons of steel reinforcement and 350 Cum3 of concrete. Our team carried out a number of roles on the project including Head of Safety, Principal Contractor Safety Manager and CDM Coordinator.
Denny Overhead Line Replacement, Beauly
Denny Overhead Line Replacement, Beauly
Project: Beauly-Denny Overhead Line Replacement
Client: Scottish Hydro Electricity Transmission Ltd
Our Services:
- CDM Coordinator
- Safety Advisor
Contract Value: £700+ million
The works involve the construction of a new 400kV overhead transmission line which includes 600 towers ranging from 65m to 42m high through some of the most exposed terrain in the UK. In addition to the construction of a new transmission line between Beauly and Wharry Burn, the project involves building substations at Beauly, Fasnakyle, Fort Augustus, Tummel Bridge, Braco and Denny. All the substations consist of a fenced area containing transformers, switch gear and overhead line towers. The existing line was also dismantled.
This includes removal of 132kV transmission lines in three sections of 6km around Beauly to replace them with the underground cables.
Between Boat of Garten and Cairnmore in the Cairngorm National Park, 53km of 132kV lines was also removed. Furthermore, 40km of 132kV overhead transmission line in the Cairngorm National Park will be replaced by 33kV overhead lines over wooden poles or underground cables.
Sections in Whitebridge and around Amulree totalling 10km will also be replaced with underground cables.
West Yorkshire Playhouse, Leeds
West Yorkshire Playhouse, Leeds
Project: West Yorkshire Playhouse
Client: Leeds City Council
Our Services:
- Principal Designer
- Project CDM Compliance
- Site Audits
Contract Value: £15+ million
Development of the existing playhouse to re-orientate the building; improve accessibility; create new performance spaces and improve sustainability through extensive renovation, refurbishment and extension.
Lagg Distillery, Isle of Arran
Lagg Distillery - Isle of Arran
Project: Lagg Distillery
Client: Isle of Arran Distillery
Our Services:
- Principal Designer
- Client Advisor
- Site Safety
Contract Value: £10+ million
The project comprises two phases. Phase one is the construction of initial road infrastructure and drainage with 6No. Bonded Warehouses. Phase 2 is the construction of the new Arran Distillery Visitor Centre and Distillery with completion of the new road infrastructure, hard and soft landscaping allowing for capacity increases in production to 1.2million litres.
Centre for Performing and Visual Arts, Dundee
Centre for Performing and Visual Arts, Dundee
Project: Centre for Performing and Visual Arts
Client: High School of Dundee
Our Services:
- Principal Design Advisor
- Client CDM Advisor
- Site Audits
Contract Value: £15 million
The project comprises the complete demolition of the northeast section of the building, renovation of the former GPO section and construction of a new extension to create a theatre and performance spaces and associated art studios.
The accommodation schedule can be summarised as follows:
Performance Hall, Studio, Drama Department, Foyer Area, Reception, Prop Storage, Costume Storage, Scene Dock, Bin Storage, Refectory Catering, Refectory Seating, Home Economics, Staff Room, Furniture Storage, Locker Area, Art Department, Music Department.
University of Edinburgh - Student Services Centre
University of Edinburgh - Student Services Centre
Project: Student Services Centre
Client: University of Edinburgh
Our Services:
- Principal Designer
- Site Audits
Contract Value: £10 million
The project comprises the restoration and extension of the existing Teviot Building, including the demolition and reconstruction of the Charles Street Lane accommodation to provide a new accessible facility suitable for the current status and needs of the University.
Radisson Red, Glasgow
Radisson Red, Glasgow
Project: Radisson Red Hotel
Client: Forrest Group
Our Services:
- Principal Designer
- Site Audits
Contract Value: Undisclosed
The works comprise enabling works for the site and construction of a new build hotel complex with associated infrastructure, hard landscaping and services.
McLaren Showroom, Leeds
McLaren Showroom, Leeds
Client: Parks of Hamilton
CDM: Advisor to Principal Designer
Architect: Nimmo and Partners
Structural Engineer: Grossart Associates
Services Engineer: tbc
Quantity Surveyor: Robert C Brown
Construction Value and Duration: £2m | tbc
Principal Contractor: Out to tender