Clyde Wind Farm

Clyde Wind Farm

Project: Clyde Wind Farm

Client: SSE Renewables

Our Services:

  • CDM Coordinator
  • Client Safety Manager
  • Principal Contractor Safety Manager

Contract Value: £500+ million

Clyde Wind Farm remains the largest single application wind farm in Europe. The site covers approximately 47.5 Sq. km of existing farmland and commercial forestry and straddles the M74. The project comprises 152 Siemens 2.3MW WTG, 2 sub stations, 2 control and 1 operation building and an off-site radar station. BOP works include formation of over 100km of access track, cabling, WTG bases comprising approximately 55 tons of steel reinforcement and 350 Cum3 of concrete. Our team carried out a number of roles on the project including Head of Safety, Principal Contractor Safety Manager and CDM Coordinator.

Contact

Denny Overhead Line Replacement, Beauly

Denny Overhead Line Replacement, Beauly

Project: Beauly-Denny Overhead Line Replacement

Client: Scottish Hydro Electricity Transmission Ltd

Our Services:

  • CDM Coordinator
  • Safety Advisor

Contract Value: £700+ million

The works involve the construction of a new 400kV overhead transmission line which includes 600 towers ranging from 65m to 42m high through some of the most exposed terrain in the UK.  In addition to the construction of a new transmission line between Beauly and Wharry Burn, the project involves building substations at Beauly, Fasnakyle, Fort Augustus, Tummel Bridge, Braco and Denny. All the substations consist of a fenced area containing transformers, switch gear and overhead line towers. The existing line was also dismantled.

This includes removal of 132kV transmission lines in three sections of 6km around Beauly to replace them with the underground cables.

Between Boat of Garten and Cairnmore in the Cairngorm National Park, 53km of 132kV lines was also removed. Furthermore, 40km of 132kV overhead transmission line in the Cairngorm National Park will be replaced by 33kV overhead lines over wooden poles or underground cables.

Sections in Whitebridge and around Amulree totalling 10km will also be replaced with underground cables.

Contact

West Yorkshire Playhouse, Leeds

West Yorkshire Playhouse, Leeds

Project: West Yorkshire Playhouse

Client: Leeds City Council

Our Services:

  • Principal Designer
  • Project CDM Compliance
  • Site Audits

Contract Value: £15+ million

Development of the existing playhouse to re-orientate the building; improve accessibility; create new performance spaces and improve sustainability through extensive renovation, refurbishment and extension.

Contact

Lagg Distillery, Isle of Arran

Lagg Distillery - Isle of Arran

Project: Lagg Distillery

Client: Isle of Arran Distillery

Our Services:

  • Principal Designer
  • Client Advisor
  • Site Safety

Contract Value: £10+ million

The project comprises two phases. Phase one is the construction of initial road infrastructure and drainage with 6No. Bonded Warehouses. Phase 2 is the construction of the new Arran Distillery Visitor Centre and Distillery with completion of the new road infrastructure, hard and soft landscaping allowing for capacity increases in production to 1.2million litres.

Contact

Centre for Performing and Visual Arts, Dundee

Centre for Performing and Visual Arts, Dundee

Project: Centre for Performing and Visual Arts

Client: High School of Dundee

Our Services:

  • Principal Design Advisor
  • Client CDM Advisor
  • Site Audits

Contract Value: £15 million

The project comprises the complete demolition of the northeast section of the building, renovation of the former GPO section and construction of a new extension to create a theatre and performance spaces and associated art studios.

The accommodation schedule can be summarised as follows:

Performance Hall, Studio, Drama Department, Foyer Area, Reception, Prop Storage, Costume Storage, Scene Dock, Bin Storage, Refectory Catering, Refectory Seating, Home Economics, Staff Room, Furniture Storage, Locker Area, Art Department, Music Department.

Contact

University of Edinburgh - Student Services Centre

University of Edinburgh - Student Services Centre

Project: Student Services Centre

Client: University of Edinburgh

Our Services:

  • Principal Designer
  • Site Audits

Contract Value: £10 million

The project comprises the restoration and extension of the existing Teviot Building, including the demolition and reconstruction of the Charles Street Lane accommodation to provide a new accessible facility suitable for the current status and needs of the University.

Contact

Radisson Red, Glasgow

Radisson Red, Glasgow

Project: Radisson Red Hotel

Client: Forrest Group

Our Services:

  • Principal Designer
  • Site Audits

Contract Value: Undisclosed

The works comprise enabling works for the site and construction of a new build hotel complex with associated infrastructure, hard landscaping and services.

Contact

McLaren Showroom, Leeds

McLaren Showroom, Leeds

Client: Parks of Hamilton

CDM: Advisor to Principal Designer

Architect: Nimmo and Partners

Structural Engineer: Grossart Associates

Services Engineer: tbc

Quantity Surveyor: Robert C Brown

Construction Value and Duration: £2m | tbc

Principal Contractor: Out to tender

Contact

Let's chat about your next project.


We’re always happy to help.

If you’re looking for more information or want to talk to someone about an enquiry, get in touch. We’d love to hear from you.

Get In Touch

Call us on:

Privacy Preference Center